Sand Lost in Storms Being Replaced on Mar Menor Beaches
Everything is going to schedule in replacing the sand lost from the beaches of San Javier, San Pedro del Pinatar and Los Alcázares (pictured) during the winter storms. That’s the view of the Murcia regional government, which says that 120 thousand cubic metres of sand is being put into place, with the work set to be
Everything is going to schedule in replacing the sand lost from the beaches of San Javier, San Pedro del Pinatar and Los Alcázares (pictured) during the winter storms. That’s the view of the Murcia regional government, which says that 120 thousand cubic metres of sand is being put into place, with the work set to be completed in time for the Easter holiday.