Connect with us

Sand Lost in Storms Being Replaced on Mar Menor Beaches

Everything is going to schedule in replacing the sand lost from the beaches of San Javier, San Pedro del Pinatar and Los Alcázares (pictured) during the winter storms. That’s the view of the Murcia regional government, which says that 120 thousand cubic metres of sand is being put into place, with the work set to be

Published

on

Everything is going to schedule in replacing the sand lost from the beaches of San Javier, San Pedro del Pinatar and Los Alcázares (pictured) during the winter storms. That’s the view of the Murcia regional government, which says that 120 thousand cubic metres of sand is being put into place, with the work set to be completed in time for the Easter holiday.

Listen to this article
Advertisement

Adverts

Subscribe via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Mark Nolan’s Podcast

Advertisement

Breadcrumbs

Home » local news » Sand Lost in Storms Being Replaced on Mar Menor Beaches

Trending

PHP Code Snippets Powered By : XYZScripts.com
Skip to content