A major Torrevieja flooding area is to have a new rainwater collector installed to improve the storm drainage system, according to contracts councillor, José Hurtado.
Work will be carried out on Avenida de Rosa Mazón by water company AGAMED, with a programme to improve the drinking water pipes in the area to be carried out at the same time.