Everything is going to schedule in replacing the sand lost from the beaches of San Javier, San Pedro del Pinatar and Los Alcázares (pictured) during the winter storms. That’s the view of the Murcia regional government, which says that 120 thousand cubic metres of sand is being put into place, with the work set to be completed in time for the Easter holiday.
Sand Lost in Storms Being Replaced on Mar Menor Beaches
Everything is going to schedule in replacing the sand lost from the beaches of San Javier, San Pedro del Pinatar and Los Alcázares (pictured) during the winter storms. That’s the view of...
Mar 13, 2017
One Min Read
Related Posts
Keeping Your Car Cool During the Spanish Summer
Jul 21, 2026
Travelling Safely with Pets This Summer
Jul 16, 2026
Packing for Summer: How to Load Your Car Safely
Jul 14, 2026