Connect with us

Around Spain

Urgent Drought Action Starting

Published

on

Under the threat of drought across the entire country, the Ministry of the Environment has authorised the first emergency transfers of water between reservoirs, with 35 cubic hectometres of water being authorised to be taken from the Pedrera reservoir in Torremendo, in order to alleviate the severe threat to the agriculture sector.

Listen to this article

This is in addition to the 15 cubic hectometres already transferred from the Pedrera to the central zone. As of Thursday of this week, before the 35 cubic hectometre transfer, the Pedrera reservoir was holding 155 cubic hectometres of its 246 capacity.

Across the Segura basin, the reservoirs are collectively holding 58% of their capacity. This time last year, the reservoirs were at 74% capacity.

Advertisement

Adverts

Subscribe via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Mark Nolan’s Podcast

Advertisement

Breadcrumbs

Home » News » Around Spain » Urgent Drought Action Starting

Trending

PHP Code Snippets Powered By : XYZScripts.com
Skip to content